Resources

The parts of this work that are hard to Google.

Field references for operators building living walls and architectural greenery — the practical detail that sits between a manufacturer brochure and a hard lesson on site.

Why This Exists

The information gap is real.

Search for living wall guidance and you get two things: manufacturer marketing, and homeowner DIY. Almost nothing written for the person who has to build it, price it and stand behind it.

This library is being built to close that gap. It is written from installed projects, including the ones that had to be fixed.

Reference Areas

What the library covers.

01

System selection

Comparing panel, tray, felt and modular systems against the conditions that actually decide the outcome — access for maintenance, water management, weight, and how the wall is reached in year two.

02

Irrigation design

Zoning logic, emitter selection, water quality, feed strategy, run-off capture and the monitoring that catches a failure before the plants announce it.

03

Plant palettes by condition

Interior low-light, west-facing exterior, humid hospitality interiors, and the difference between a plant that survives and a plant that still looks intentional after eighteen months.

04

Structure and waterproofing

Attachment, load paths, drainage planes and the interface between a living system and the building behind it — where the expensive failures live.

05

Estimating frameworks

Line-item structure for materials, labour, access equipment, plant establishment, contingency and maintenance — so the proposal reflects the real job.

06

Maintenance planning

Service intervals, replacement budgeting, seasonal work and how to write a maintenance agreement a client will actually renew.

Field Notes

Four things worth knowing before your first wall.

01
Most living wall failures are irrigation failures.The plants get blamed because the plants are what you can see. Diagnose the water before you change the palette.
02
Design for maturity, not for turnover day.A wall planted to look finished on handover day is a wall planted too densely. It will close up, compete and thin out.
03
Access is a design decision, not a maintenance problem.If reaching the top of the wall needs a lift and a road closure, the maintenance contract will quietly stop being renewed.
04
Somebody has to own it after handover.Decide who, in writing, before installation. The wall is alive on day two whether or not that conversation happened.

The reference library starts with SEED.

The first module is free and covers the part that comes before any of this: recognising the opportunity and knowing which capabilities you already hold.

Get the free SEED module →

No cost · Sent immediately · Unsubscribe anytime